We have successfully completed the stitch drilling, track sawing and removal of concrete to form pile caps within a basement ready for a steel structure to be erected. We are now drilling the perimeter of the slab for starter bars before reinforcing cages are installed.
Forming Pile Caps Project in Camden, North London
Updated: Mar 10, 2023
Comments